04Meridian story · ch 4 of 8
Activate knowledge and governed work· Story
The eventual recommendation can be traced to evidence and governed methods, not unexplained model output.
W-1047 · LEDGER
Validate landed cost for LLDPE lane
DoneReview required
Description
Validate freight lane and landed cost for the Meridian Shenzhen → Chicago truckload move.
Depends on
Review state
Requires reviewYes
Human roleReview required
StatusDone
A human should review the outputs of this work before downstream steps proceed.
Runs — 1
RUN-20260805-1045 · Aug 5, 06:41 AM · 7.2s · 91% conf · → YIELD
Inputs
supplier: Zhenhuaroute: Shenzhen sea+rail
Landed cost validated
Landed Cost ModelCredit Checkk04
Artifacts and evidence — 1
Landed Cost Validation output — Validate landed costevidence
Aug 5, 06:41 AM
Landed cost: supplier $398k + logistics $68.4k + insurance $6.1k + duty $31.8k + financing $12.7k = $517.0k. Unit landed $103.40.
Next in the Meridian story · Chapter 5 of 8
One task, one owner, one governed method — continue through the knowledge that guides the work.
What happens next: Build executable supply options — ORIGIN — Supplier Discovery — evaluates polymer suppliers and their inventory positions; VECTOR — Freight and Routing — evaluates truckload lanes; SENTINEL — Risk and Compliance — applies controls.